Facilities Management continuously endeavors to improve the Health Science Center infrastructure, be it the improvement of a clerical office or the renovation of a department floor. FM's team of dedicated men and women, from the time the clerk inputs work order data to the carpenter hammering the first nail to the housekeeper hauling away the last piece of scrap, all work together to get the job done.
![]() |
PARC Building Modifications Facilities Management and Environmental Health & Safety is modernizing the PARC Building stairwells and exterior building entrances. |
![]() |
Improvements to Electrical Sustainability Facilities Management has worked on the design and implementation of a new Switchgear, Automatic Transfer Switch, and Transformers for the electrical sustainability at the Long Campus. |
![]() |
Corridor Improvements 3.049V UT Health San Antonio is pleased to announce the renovation of the 3rd floor V-Section corridor near the offices of the Department of Cellular and Integrative Physiology. |
![]() |
Cancer Center Clinical Renovations The recently announced agreement between UT Health San Antonio and MD Anderson brings new funding from the UT System and private sources to improve the infrastructure at the Cancer Treatment and Research Center. |
![]() |
Medical and Dental Building Lab Renovation Construction is currently underway for campus wide research lab renovation projects |
Completed Projects
![]() |
Radiology Oncology Vault Renovations Renovations of vaults 2 and 4 of the Mays Cancer Center Grossman building for new Linear Accelarators completed. |
![]() |
UTPD Renovations on Long Campus Renovations of the former Campus Bookstore were performed to provide a new technologically advanced home for the University Police Department. |
![]() |
Academic and Administration Building Renovations Renovations completed at the Academic and Administration Building (AAB). |
![]() |
Briscoe Library Ramp Construction Facilities Management renovated the access ramp in front of the Briscoe Library and the access ramps along the curbs near the accessible parking spaces. |
![]() |
MARC Clinical Expansion The projects included converting the 7th and 8th floors from administrative space to clinical space and adding a nuclear medicine suite within the 3rd floor Radiology clinic. |
![]() |
Professional Administrative Resource Center Renovations Facilities Management completed renovations of the Professional Administrative Resource Center (PARC) building. |
![]() |
Renovation of Lab on Fifth Floor of Medical School Project combined multiple lab areas into one larger and modern laboratory. |
![]() |
Emergency Generator Upgrades on the Long Campus Installation of additional emergency generators on the Long Campus complete. |
![]() |
Modernization of Elevators in McDermott and Dental School buildings Improvements complete on multiple elevators. |
![]() |
Academic Learning and Teaching Center Demolition of the Annex trailers and expanded parking make way for the construction of a new facility on main campus. |
![]() |
Roof Replacement over L Section & the M/S Penhouses Replacement portions of the Medical School Roof above L section and the penthouses completed. |
![]() |
Exterior Lighting Improvements Facilities Management recently installed state of the art LED light fixtures. |
![]() |
Upgrades to Lecture Hall Corridor Improvements to the corridor that connects the Lecture Hall to the Medical School in an effort to improve the pedestrian flow and provide additional seating for students and staff. |
![]() |
Elekta Linear Accelerator at the CTRC Facilities renovation of vault paves way for installation of high-energy x-ray device. |
![]() |
Floor Modifications for Nursing School Facilities Management recently completed targeted accessibility upgrades to several of the education spaces in the Nursing school. |
![]() |
Fire Sprinkler System Installation in Medical School Year-round project provides 100% safety coverage of entire building . |
![]() |
Refresh of Classroom 309L Construction Division completes refurbishing of key classroom in Medical Schoool. |
![]() |
Lecture Hall, Emergency Medicine Healthcare education enhanced with construction of hall and implementation of premium A/V system. |
![]() |
Center for Clinical Ultrasound, Undergraduate Medical Education Office Ultrasound education enhanced with construction of center. |
![]() |
Expansion of Parking Lot # 8 Main visitor parking lot on Long Campus gets more spaces. |
![]() |
New Roof for the Briscoe Library |
![]() |
Renovation of 5th Floor Basic Science Building Renowned immunologist to joins the HSC. |
![]() |
South Texas Simulated Teaching Hospital Facility will provide real-world experiences at the Regional Academic Health Center (RAHC). |
![]() |
Greehey Chilled Water Expansion Installation of water lines near the MARC and STRF buildings. |
![]() |
Cooling Towers of the Energy Plant 50-year old facility gets facelift. |
![]() |
Renovation of 5th Floor of Briscoe Library HVAC overhaul, new paint and ceiling. |
![]() |
Nursing School Classroom Refresh Winter break gave Facilities time to refurbish Nursing classrooms. |
![]() |
Renovation of the Medical Dean's Office Space has been reconfigured for better use, new carpet and small kitchen. |
![]() |
School of Nursing's "Virtual Hospital" Current sub-level area makes way for clinical skills labs. |
![]() |
Renovation of Ob/Gyn Laboratories |
![]() |
Grossman Building Roof Remodel |
![]() |
Modernization of Elevators in Lozano Long campus buildings Most heavily used elevators on the main campus get upgrades. |
![]() |
Renovation of Multi-disciplinary (MD) Labs in Dental School Labs in the Oral and Maxillofacial Surgery department get a facelift. |
![]() |
Holly Auditorium remodeling Main HSC auditorium gets modernized. |
![]() |
Photovoltaic System Solar panels will reduce HSC's energy consumption. |
![]() |
Starbucks The popular restaurant chain finds its way to the HSC. |
![]() |
New Employee Health and Wellness Clinic The HSC celebrates Wellness Week with the opening of a new clinic. |
![]() |
Renovation of UT Police Service and Office Areas Project completed with minimal interruption to UTPD's daily operations. |
![]() |
Renovation of the Pestana Lecture Hall New seating, carpet and paint are just a few of the upgrades that the lecture hall received. |
![]() |
The Path to Improved Life at the HSC A 'shared path' around the HSC perimeter to allow walking, jogging and other healthy means to get those 10,000 steps a day. |
![]() |
MRI Scanners at the McDermott Clinical Science Building The HSC receives three very powerful magnetic resonance imaging scanners. |
![]() |
Construction of the Lozano Long Campus Monument In commemoration of the generous donation given by Joe R. and Teresa Lozano Long and the subsequent renaming of the HSC campus, FM built a beautiful monument that greets all who enter the University. |
![]() |
Construction of Site for CTRC's Linear Accelerator The CTRC enlisted FM to help house a multi-million dollar machine aimed to treat cancer patients better and faster. |
![]() |
Renovation of the Nursing School Courtyard The Nursing courtyard got a much-needed facelift. Increased space and wheelchair access are just a few of the enhancements. |
![]() |